60 miles of tar roads, 32 miles of gravel roads, 30 bridges, 35 miles of sidewalks, 645 culverts, 2,000 drainage structures and the piping to connect them all, maintenance of all road signs. Add to that: filling in potholes, the whole issue of drainage of heavy rains we’ve been getting, pothole repairs, laying new surfaces on existing roads, regrading dirt roads, painting traffic lines on streets and shall I add snowplowing, mudseason? I could go on. The town employs twelve guys to look after that worklist and more. Gary Corey is one of them, and he’s the first to say it takes every guy to pull this off.
Read More©Kristopher Radder Brattleboro Reformer